T3rox
04-04-2001, 07:49 PM
hey, its me again, Mr. "NOTHIN EVER WORKS RIGHT"
This time its the Vision Peak, in my previous post i stated that the T3 ran as iff the battery was half dead, then i recharged my battery, and unpluged it from the wall before i unpluged it from the back, the battery charge indicator indicated to me, that the pack was "51-75%" and when i unplugged it, the Green Light was on, and it was supposed to be fully charged, but, i just got this thing too! and if it were only half charged, why does it run REALLY FAST in my Stampeed?!?
Just wonderin what is goin on. my frineds don't know, and frankly, nor do i... thanks http://www.rccaraction.com/ubb/smile.gif
This time its the Vision Peak, in my previous post i stated that the T3 ran as iff the battery was half dead, then i recharged my battery, and unpluged it from the wall before i unpluged it from the back, the battery charge indicator indicated to me, that the pack was "51-75%" and when i unplugged it, the Green Light was on, and it was supposed to be fully charged, but, i just got this thing too! and if it were only half charged, why does it run REALLY FAST in my Stampeed?!?
Just wonderin what is goin on. my frineds don't know, and frankly, nor do i... thanks http://www.rccaraction.com/ubb/smile.gif